Subsurface surfing. With the help of the maintenance staff, we went underground, following the maintenance track that connects all buildings on our Ruhr campus.

In total, it’s more than 8 km, we walked 2.5 km, from the uni datacentre to our faculty building.

#sts #infrastructure #it #photography

Picture of cables well organised on the path to eternity, in a grey concrete surrounding. It'd a long barrow path, pipes to the left, cables to the right. Boring and exciting at the same time. A ladder teaching upwards. Again, dark, grey, concrete, deadA man walks along a narrow concrete path. He wears blue maintenance staff clothing. He walks quickly. You see the concrete wall on the right with red paint fainting. Eerie